Informácie
Názov zákazky:
Implementation of Battery Energy Storage System at Čierny Váh
Kód zákazky:
2026/18302
Kód oznámenia:
15279 - MRT
Postup:
Rokovacie konanie so zverejnením výzvy na súťaž/súťažné obstarávanie s rokovacím konaním
Druh:
Tovary
Predpokladaná hodnota:
Neuvedená v evidovaných dátach
Termíny
Lehota na žiadosti o účasť:
26.11.2026 11:00 Implementation of Battery Energy Storage System at Čierny Váh
Vyhlásenie:
28.10.2026
Verejný obstarávateľ
Adresa:
Pribinova
811 09 Bratislava - mestská časť Ružinov
NUTS:
SK010 - Bratislavský kraj
Miesto dodania:
Pribinova 40 Bratislava - mestská časť Ružinov 811 09 Slovensko
Zdroj:
Vestník ÚVO
Popis
The subject matter of the tender comprises EPC performance of all supplies and služby related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and služby: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market služby, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and služby necessary to ensure safe, reliable and long-term operation of the BESS installation.